Home » Projets » 2003 IFA 2000 – CABLE 11 REPAIR

2003 IFA 2000 – CABLE 11 REPAIR

500 MW HVDC Power cable repair.

Location : FRANCE to ENGLAND Channel
Client : RTE

Length (km): 0,6
Water depth (m) : 25
Vessel : Barge
Burial system : MED1 (Dredge pump)
Burial depth (m) : 0,6
Product : Power Cable
Weight (kg/m) : 35
Diameter : 108 mm

Other projects

  • 2020 TANNAT and MALBEC Systems

    Separate landing. Laying and burial of 2 fiber optic cables in Las Toninas (Argentina). Installation of shells.
    Burial system : ROVJET 404
    Plus d’infos
  • 2013 LONDON ARRAY

    Provision of personnel and equipment to carry out the post burial of 54 infield cables, some in very shallow water.
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 2012 CAT – THAÏLAND

    2 separate pre-laid shore ends at Sri Racha and Songkhla + Installation of articulated pipes.
    Burial system : EBJ 04 + ESV12 (jetting)
    Plus d’infos