2020 TANNAT and MALBEC Systems

Pre Lay Grapnel Run and Route Clearance to a depth of 1,500 m in May.

Separate landing. Laying and burial of 2 fiber optic cables in Las Toninas (Argentina).

Installation of shells.

Location: Las Toninas (Argentina)

Client: Alcatel Submarine Networks (ASN)

Product: Optical fiber

Length: 2 x 7 km

Depth: 15 m

Ship: DP

Burial system: ROVJET 404

Burial depth: 1.5 m

Period: November

Other projects

  • 2017 BEATRICE OWF

    Provision of personnel and equipment to carry out the post lay burial of 56 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos
  • 2012 CAT – THAÏLAND

    2 separate pre-laid shore ends at Sri Racha and Songkhla + Installation of articulated pipes.
    Burial system : EBJ 04 + ESV12 (jetting)
    Plus d’infos
  • 2000 FLAG ATLANTIC 1

    3 separate shore end installations as part of the FLAG Atlantic 1 telecommunication cable system.
    Burial system : MED1 (Jetting) and ESV11 (Plough)
    Plus d’infos