2020 TANNAT and MALBEC Systems

Pre Lay Grapnel Run and Route Clearance to a depth of 1,500 m in May.

Separate landing. Laying and burial of 2 fiber optic cables in Las Toninas (Argentina).

Installation of shells.

Location: Las Toninas (Argentina)

Client: Alcatel Submarine Networks (ASN)

Product: Optical fiber

Length: 2 x 7 km

Depth: 15 m

Ship: DP

Burial system: ROVJET 404

Burial depth: 1.5 m

Period: November