Home » Projets » 2005 SEA-ME-WE 4

2005 SEA-ME-WE 4

Direct shore ends / Laying and burial of FO cable

Location : Mediterranean Sea
Client : Alcatel Submarine Networks

Length (km): 2,95
Water depth (m) : 12
Vessel : Pontoon
Burial system : Dredge pump (with divers)
Burial depth (m) : 0,8
Product : Fibre optic cable
Weight (kg/m) : 5
Diameter : 46 mm