Home » Projets » 1996 THAILANDE

1996 THAILANDE

Mainland to KO SAMUI Island /Laying and burial of 115 kV power cable

Location : THAILAND / MAIN LAND to KO SAMUI
Client : ALCATEL / PEA

Length (km): 24
Water depth (m) : 26
Vessel : Barge
Burial system : TM02 (Trencher) – TJV04 (Jetting)
BD (m) : 1,5
Product : Power cable
Weight (kg/m) : 46
Diameter : 135 mm

Other projects

  • 2008 PERENCO RDC

    Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2003 ILE D’YEU

    Mainland to island / Shore ends / Laying and burial of 20 kV pc
    Burial system : N.A.
    Plus d’infos
  • 2023 BLUE BASTIA

    1 x Direct landing in Bastia, shell installation, post-burial, anchor installation with posidonies
    Burial system :
    Plus d’infos