Home » Projets » 2022 MAPUTO

2022 MAPUTO

Separate landing in Maputo. Laying and post-wiring of 42 km of fiber-optic cable

Location: Maputo – Mozambique
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 42 km
Water depth (m) :
Vessel: BARGE DP
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2000 Dumpton Gap – Level 3

    Remedial work : Lay and simultaneous burial of fibre optic cable.
    Burial system : ESV11 (Plough)
    Plus d’infos
  • 2024 REVOLUTION WIND

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos
  • 2023 BLUE GENOA

    2 x Direct landings at Genoa in a directional borehole. Shell installation
    Burial system :
    Plus d’infos