Home » Projets » 1998 VNF SUD FRANCE

1998 VNF SUD FRANCE

Along river – canal / Dual fibre optic cable.

Location : FRANCE / FOS – MONTPELLIER
Client : MCI WORLDCOM / LD COM NETWORKS

Length (km): 90
Water depth (m) : 6,5
Vessel : Spud Barge
Burial system : EBJ 02 (jetting)
Burial depth (m) : 0,5
Product : Fibre optic cable
Weight (kg/m) : 2
Diameter : 24 mm

Other projects

  • 2023 BLUE MARSEILLE

    1 x Reverse Shore end in Marseilles , laying of seagrass anchors, laying of sinks, post-silting
    Burial system :
    Plus d’infos
  • 2021 AMITIE

    Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.
    Burial system :
    Plus d’infos
  • 2023 2 AFRICA SOUTH AFRICA

    1 x Direct landing in Port Elizabeth, shell installation, post beaching, clamp installation. Installation of grounding system
    Burial system :
    Plus d’infos