Home » Projets » 1998 VNF SUD FRANCE

1998 VNF SUD FRANCE

Along river – canal / Dual fibre optic cable.

Location : FRANCE / FOS – MONTPELLIER
Client : MCI WORLDCOM / LD COM NETWORKS

Length (km): 90
Water depth (m) : 6,5
Vessel : Spud Barge
Burial system : EBJ 02 (jetting)
Burial depth (m) : 0,5
Product : Fibre optic cable
Weight (kg/m) : 2
Diameter : 24 mm

Other projects

  • 2025 2 AFRICA PEARLS BARHEIN

    Separate landing in Bahrain. Laying and post-wiring 35 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 1999 CIRCE

    Cable deburial / reburial and cable loop burial on CIRCE fibre optic cable system.
    Burial system : MED1 (Dredge pump) – CASTOR (Trencher)
    Plus d’infos
  • 2022 2 AFRICA & BLUE

    Pre Lay Grapnel Run (PLGR) & Route Clearance (RC) for the BLUE and 2Africa projects in the Mediterranean Sea
    Burial system :
    Plus d’infos