Home » Projets » 1998 BELIZE

1998 BELIZE

Main land to island / 34.5 kV power extension.

Location : BELIZE / BOMBA – BOCA CHICA
Client : ALCATEL / BELIZE ELECTRICITY

Length (km): 19,5
Water depth (m) : 3,3
Vessel : Spud Barge
Burial system : TJV04 : Jetting sled
Burial depth (m) : 1
Product : Power Cable
Weight (kg/m) : 22,6
Diameter : 118 mm

Other projects

  • 2013 LONDON ARRAY

    Provision of personnel and equipment to carry out the post burial of 54 infield cables, some in very shallow water.
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 2020 JOHAN SVERDRUP 2

    Post lay burial of seismic fibre optic cable in Johan Sverdrup Field (Equinor)
    Burial system : ROVJET 1206
    Plus d’infos
  • 2022 MAPUTO

    Separate landing in Maputo. Laying and post-wiring of 42 km of fiber-optic cable
    Burial system :
    Plus d’infos