Home » Projets » 1999 DCN TOULON

1999 DCN TOULON

Power and composite cables inside miltary harbour.

Location : FRANCE / TOULON
Client : ALCATEL CABLE / DCN

Length (km): 5,8
Water depth (m) : 12
Vessel : Inflatable / works craft
Burial system : N.A.
Burial depth (m) : N.A.
Product : Composite
Weight (kg/m) : 15
Diameter : 88 mm

Other projects

  • 2007 ATLAS OFFSHORE

    FO cable shore ends – Post lay burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2022 GRACE HOPPER

    Separate landing in a directional borehole. Simultaneous installation and beaming with mechanical trencher
    Burial system :
    Plus d’infos
  • 2001 APOLLO UK SHORE END

    Cable lay and burial BUDE shore end (UK).
    Burial system : TJV04 (Jetting)
    Plus d’infos