Home » Projets » 1999 DCN TOULON

1999 DCN TOULON

Power and composite cables inside miltary harbour.

Location : FRANCE / TOULON
Client : ALCATEL CABLE / DCN

Length (km): 5,8
Water depth (m) : 12
Vessel : Inflatable / works craft
Burial system : N.A.
Burial depth (m) : N.A.
Product : Composite
Weight (kg/m) : 15
Diameter : 88 mm

Other projects

  • 2014 GÉOCEAN BÉNIN

    Laying of 14km of power cable between mainland and a platform. Burial in shallow water from 8m to the beach.
    Burial system : EBJ (jetting)
    Plus d’infos
  • 2023 BLUE GENOA

    2 x Direct landings at Genoa in a directional borehole. Shell installation
    Burial system :
    Plus d’infos
  • 2024 NIGERIA 2

    Separate landing at Qua Lboe. Laying and post-wiring of 22.4 km of fiber optic cable
    Burial system :
    Plus d’infos