Home » Projets » 1997 SOUTH KOREA

1997 SOUTH KOREA

Protection by cement mattress of a power cable and a fiber-optic cable between the mainland and CHEJU island.

Location : SOUTH KOREA / Main land to CHEJU Island
Client : ALCATEL CABLE

Length (km): 48
Water depth (m): 36
Vessel: None
Burial system: COPS (mattresses protection)
Burial depth (m): 0,5
Product: Power cable / Fibre optic cable
Weight (kg/m): 5,5/26,1
Diameter: 45/100 mm

Other projects

  • 2025 CSN-1 PANAMA

    Separate landing at Costa del Este. Laying and post-wiring of 11.8 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2022 2 AFRICA Spain

    1 x Direct landing in Barcelona, shell installation and post-burial. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2023 BLUE MARSEILLE

    1 x Reverse Shore end in Marseilles , laying of seagrass anchors, laying of sinks, post-silting
    Burial system :
    Plus d’infos