2012 PAIMPOL BRÉHAT

Main DC power cable installation between mainland and 15 km offshore as part of EDF’s tidal generation project. Simultaneous protection : burial (4km) / Articulated pipes (11 km)

Location : ENGLISH CHANNEL / PAIMPOL (FRANCE)
Client : EDF

Length (km): 15
Water depth (m) : 0 to 35
Vessel : Barge
Burial system : TM03 (trencher)
Burial depth (m) : 1
Product : Power Cable
Weight (kg/m) : 17
Diameter : 112 mm