Home » Projets » 1999 ELGIN FRANKLIN

1999 ELGIN FRANKLIN

Platform to platform / Composite power and communication cable + 1 composite power / communication cable + 1 umbilical.

Location : NORTH SEA / Elgin – Franklin Shearwater Fields
Client : ELF EXPLORATION UK / COFLEXIP STENA OFFSHORE

Length (km): 13,9
Water depth (m) : 92
Vessel : DP Vessel
Burial system : CASTOR 2 : Mechanical Trencher
BD (m) : 0,75 to 0,9
Product : Composite
Weight (kg/m) : 18,1 / 39,7
Diameter : 99 / 139 mm

Other projects

  • 2018 MERKUR OWF

    Provision of personnel and equipment to carry out the post lay burial of 57 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos
  • 2025 2 AFRICA PEARLS BARHEIN

    Separate landing in Bahrain. Laying and post-wiring 35 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2015 WASIT

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM04 (trenching)
    Plus d’infos