Home » Projets » 2012 THORNTON BANK

2012 THORNTON BANK

Post-Lay burial of the export power cable of the Thornton Bank Offshore Windfarm.

Location : Thornton Bank Windfarm, Ostende (BELGIUM)
Client : VSMC / C-POWER

Product : Power Cable 
Length (km): 36
Water depth (m) : 0 to 26
Vessel : DP Vessel + Barge
Burial system : ROVJET605 + ROVJET806 (jetting)
Burial depth (m) : 1.5 
Weight (kg/m) : max 44
Diameter : max 234 mm

Other projects

  • 2024 NIGERIA

    Separate landing in Lagos. 2.8 km of fibre-optic cable sunk in water
    Burial system :
    Plus d’infos
  • 2014 BUTENDIEK

    Provision of personnel and equipment to carry out the post burial of 86 infield power cables.
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2021 EAUFON

    Separate shore ends in Chisasibi river. Laying and burial of 19 km of fibre optic cable. Installation of articulated pipes .
    Burial system :