Home » Projets » 2012 THORNTON BANK

2012 THORNTON BANK

Post-Lay burial of the export power cable of the Thornton Bank Offshore Windfarm.

Location : Thornton Bank Windfarm, Ostende (BELGIUM)
Client : VSMC / C-POWER

Product : Power Cable 
Length (km): 36
Water depth (m) : 0 to 26
Vessel : DP Vessel + Barge
Burial system : ROVJET605 + ROVJET806 (jetting)
Burial depth (m) : 1.5 
Weight (kg/m) : max 44
Diameter : max 234 mm

Other projects

  • 2018 ASC Perth

    1 separate shore end. 10 km cable installation with laying and burial.  Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2017 QUINTILLION ALASKA

    1 separate shore end. 16 km cable installation with laying and burial.
    Burial system : ESV12 (vibrating plough)
    Plus d’infos
  • 2001 ULYSSE

    Recover of existing cable (5 km), simultaneous lay and burial work (ESV12), PLIB work of joints (MED 1 and diver pump).
    Burial system : MED1 (Dredge pump) – ESV12 (Plough)
    Plus d’infos