Home » Projets » 2014 EMF Trials in situ

2014 EMF Trials in situ

Performance of trenching trials on the 3 sites of Fécamp, Courseulles and Saint-Nazaire as part of the preparation of the call for tenders for the construction works of the French offshore windfarms.

Location : Fécamp, Courseulles, Saint Nazaire – France
Client : EMF

Length (km): 
Water depth (m) : 30
Vessel : DP Vessel
Burial system : ROVJET806 (jetting) + TM03 (trencher / vibrating plough)
Burial depth (m) : 1
Product : NA
Weight (kg/m) : NA
Diameter : NA

Other projects

  • 2015 ILE D’YEU

    Surface laying of 2 sections of power cable YEU3 and YEU4.
    Burial system : N.A.
    Plus d’infos
  • 2021 EAUFON

    Separate shore ends in Chisasibi river. Laying and burial of 19 km of fibre optic cable. Installation of articulated pipes .
    Burial system :
    Plus d’infos
  • 2016 BBG FUJAIRAH

    1 direct FO shore-end in Fujairah (UAE). Protection of cable (burial and articulated pipes)
    Burial system : EBJ (jetting)
    Plus d’infos