Home » Projets » 2025 ZULUF

2025 ZULUF

Supply of personnel and trenching services for the burial of a 230 kV composite submarine cable in the Zuluf field

Location: Kingdom of Saudi Arabia
Customer: McDERMOTT

Length (km): 35 km
Water depth (m): 17 m
Vessel: PRESTIGE 3302
Trenching system: TMO 3 Trencher
Trenching depth (m): 1
Product : Power cable
cable type: 230kV, 3C x 630mm²
OD 230mm

Other projects

  • 2012 THORNTON BANK

    Post-Lay burial of the export power cable of the Thornton Bank Offshore Windfarm.
    Burial system : ROVJET605 + ROVJET806 (jetting)
    Plus d’infos
  • 2017 IFA 2000 CABLES REPAIR

    Repair of 4 power cables being part of the IFA 2000 link .
    Burial system : MED 1 (Dredge pump) + ROVJET806 (jetting)
    Plus d’infos
  • 2024 HAI LONG

    Post Lay Burial of EXP
    Burial system :
    Plus d’infos