2017 IFA 2000 CABLES REPAIR

Repair of 4 power cables being part of the IFA 2000 link .

Location : FRANCE to ENGLAND Channel
Client : RTE

Water depth (m) : 20
Vessel : 3 DP Vessels
Burial system : MED1 (Dredge pump) + ROVJET806 (jetting)
Burial depth (m) : 0,6 max
Product : Power Cable
Weight (kg/m) : 35
Diameter : 108 mm