Home » Projets » 2015 BALTIC 2

2015 BALTIC 2

Provision of personnel and equipment to carry out the post burial of 75 infield power cables.

Location : BALTIC 2 Offshore Windfarm / German Baltic Sea
Client : Siem Offshore Contractors

Product : Power Cable 
Length (km): 61
Water depth (m) : up to 45 m
Vessel : DP Vessel
Burial system : ROVJET806 (jetting)
Burial depth (m) : 2
Weight (kg/m) : –
Diameter : 

Other projects

  • 2014 SAFANIYA 2

    Provision of personnel and equipment to carry out the trenching of a 115 kV power composite cable in shallow water.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2011 WALNEY 1

    Post Lay Inspection and Burial of infield power cables
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 2006 JAKASUSI

    FO cable shore ends / Laying and burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos