Home » Projets » 2015 ILE D’YEU

2015 ILE D’YEU

Surface laying of 2 sections of power cable YEU3 and YEU4.

Location : Ile d’Yeu / France
Client : ERDF

Product : power cable 
Length (km): 1.8 + 3
Water depth (m) : up to 10 m
Vessel : N.A.
Burial system : N.A.
Burial depth (m) : N.A.
Weight (kg/m) : 19
Diameter (mm): 93

Other projects

  • 2014 GÉOCEAN BÉNIN

    Laying of 14km of power cable between mainland and a platform. Burial in shallow water from 8m to the beach.
    Burial system : EBJ (jetting)
    Plus d’infos
  • 2018 ASC Perth

    1 separate shore end. 10 km cable installation with laying and burial.  Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2023 BLUE MARSEILLE

    1 x Reverse Shore end in Marseilles , laying of seagrass anchors, laying of sinks, post-silting
    Burial system :
    Plus d’infos