2016 FITZROY Darwin

1 separate shore end. 3km cable installation with laying and post burial.  Installation of articulated pipes.

Location : Darwin / Australia
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable
Length (km): 3
Water depth (m) : up to 20 m
Vessel : Barge
Burial system : TO Mobile (jetting)
Burial depth (m) : 2
Weight (kg/m) : 3.5
Diameter (mm) : 35

Other projects

  • 2015 ILE D’YEU

    Surface laying of 2 sections of power cable YEU3 and YEU4.
    Burial system : N.A.
    Plus d’infos
  • 2011 ACE – SENEGAL

    2 direct FO shore-ends in Dakar (Senegal). Protection of cable (burial, articulated pipes, grout bags)
    Burial system : EBJ (Jetting)
    Plus d’infos
  • 2008 DELMA

    Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.
    Burial system : TM04 (Trencher)
    Plus d’infos