1 shore end in Germany :  laying and burial of FO cable + installation of articulated pipes. Laying and burial of the same cable offshore in Denmark, in low water depths.

Location : Germany – Denmark
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable
Length (km): 9.7 + 8.2
Water depth (m) : up to 15 m
Vessel : DP vessel
Burial system : ROVJET404 + EBJ (jetting)
Burial depth (m) : 1
Weight (kg/m) : 3.6
Diameter : 35