2001 I 2 I / Shore end MADRAS

Cable lay and burial – 8 km CHENNAI shore end.

Location : INDIA / MADRAS i2i cable
Client :  ALCATEL SUBMARINE NETWORKS

Length (km) :  8
Water depth (m) : 23
Vessel : Vessel
Burial system : TJV05 + TJV04 (Jetting) + ESV07 (Plough)
Burial depth (m) : 1
Product : Fibre optic cable
Weight (kg/m) : 7,8
Diameter : 56 mm