Home » Projets » 2017 SAFANIYA 5

2017 SAFANIYA 5

Provision of personnel and equipment to carry out the simultaneously trenching of five 15 kV submarine power cables on Safaniya 5 field.

Location : Safaniya 5 field – Saudi Arabia
Client : Mc Dermott Arabia Company Ltd

Product : Power Cable
Length (km): 22 km
Water depth (m) : 10-15
Vessel : Barge
Burial system : TM03 (trencher)
Burial depth (m) : 1
Weight (kg/m) : 19
Diameter (mm) : 100

Other projects

  • 1999 CIRCE

    Cable deburial / reburial and cable loop burial on CIRCE fibre optic cable system.
    Burial system : MED1 (Dredge pump) – CASTOR (Trencher)
    Plus d’infos
  • 2024 HAI LONG

    Post Lay Burial of EXP
    Burial system :
    Plus d’infos
  • 2025 PEARLS CABLE STORAGE

    Storage of fiber optic cable and repeaters in Bahrain
    Burial system :
    Plus d’infos