2024 HAI LONG

Post Lay Burial of EXP

Location: Taiwan
Customer: SEAWAY 7

Length (km): 113 km
Water depth (m) :
Vessel: Boka Tiamat
Beaching system: ROVJET 1217 B
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø

Other projects

  • 2015 FITZROY Port Hedland

    2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.
    Burial system : TM04 (trenching) + EBJ (jetting)
    Plus d’infos
  • 2014 EMF Trials in situ

    Performance of trenching trials for the construction works of the French offshore windfarms.
    Burial system : ROVJET806 (jetting) + TM03 (trencher / vibrating plough)
    Plus d’infos
  • 2024 MAJAN 1

    1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos