Home » Projets » 2017 SAFANIYA 5

2017 SAFANIYA 5

Provision of personnel and equipment to carry out the simultaneously trenching of five 15 kV submarine power cables on Safaniya 5 field.

Location : Safaniya 5 field – Saudi Arabia
Client : Mc Dermott Arabia Company Ltd

Product : Power Cable
Length (km): 22 km
Water depth (m) : 10-15
Vessel : Barge
Burial system : TM03 (trencher)
Burial depth (m) : 1
Weight (kg/m) : 19
Diameter (mm) : 100

Other projects

  • 2020 JOHAN SVERDRUP 2

    Post lay burial of seismic fibre optic cable in Johan Sverdrup Field (Equinor)
    Burial system : ROVJET 1206
    Plus d’infos
  • 2025 2 AFRICA PEARLS BARHEIN

    Separate landing in Bahrain. Laying and post-wiring 35 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2012 CAT – THAÏLAND

    2 separate pre-laid shore ends at Sri Racha and Songkhla + Installation of articulated pipes.
    Burial system : EBJ 04 + ESV12 (jetting)
    Plus d’infos