Home » Projets » 2021 EAUFON

2021 EAUFON

Separate shore ends in Chisasibi river. Laying and burial of 19 km of fibre optic cable. Installation of articulated pipes .

Place: Chisasibi (Québec)
Client : Alcatel Submarine Networks (ASN)

Product : fibre optic cable
Length: 19 km
Depth: Up to 15 m
Ship: DP Pontoon
Burial system: TO MOBILE
Burial depth: 1 m

Period: August 2021

Other projects

  • 2014 EMF Trials in situ

    Performance of trenching trials for the construction works of the French offshore windfarms.
    Burial system : ROVJET806 (jetting) + TM03 (trencher / vibrating plough)
    Plus d’infos
  • 2023 CONGO

    Separate landing at Pointe Noire. Laying and post-wiring of 8.8 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2024 2 AFRICA PEARLS

    1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos