2023 CONGO

Separate landing at Pointe Noire. Laying and post-wiring of 8.8 km of fiber optic cable

Location: Pointe Noire – CONGO
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 8.8 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2011 KASHAGAN

    Provison of burial services for 4 power and FO cables and 6 umbilicals.
    Burial system : TM03 (Trencher) + ESV12 (Plough)
    Plus d’infos
  • 2018 IFA 2000 CABLES REPAIR

    Repair of 2 power cables being part of the IFA 2000 link on the beach at Sangatte.
    Burial system : ROVJET 605 (jetting) + Massflow
    Plus d’infos
  • 2001 I 2 I / Shore end MADRAS

    Cable lay and burial – 8 km CHENNAI shore end.
    Burial system : TJV05 + TJV04 (Jetting) + ESV07 (Plough)
    Plus d’infos