Home » Projets » 2023 CONGO

2023 CONGO

Separate landing at Pointe Noire. Laying and post-wiring of 8.8 km of fiber optic cable

Location: Pointe Noire – CONGO
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 8.8 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 1999 ELGIN FRANKLIN

    Platform to platform / Composite power and communication cable + 1 composite power / communication cable + 1 umbilical.
    Burial system : CASTOR 2 (Trencher)
    Plus d’infos
  • 2021 YUNLIN OWF

    Provision of personnel and equipment to carry out the post lay burial of infield array cables.
    Burial system :
    Plus d’infos
  • 2022 2/AFRICA GENES

    2 x Direct landings in Genoa. Installation of shells and post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos