Separate landing at Pointe Noire. Laying and post-wiring of 8.8 km of fiber optic cable

Location: Pointe Noire – CONGO
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 8.8 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2008 PERENCO – CAMEROON

    Barge operating for pipe laying
    Burial system : N.A.
    Plus d’infos
  • 2025 CSN-1 PANAMA

    Separate landing at Costa del Este. Laying and post-wiring of 11.8 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2021 EAUFON

    Separate shore ends in Chisasibi river. Laying and burial of 19 km of fibre optic cable. Installation of articulated pipes .
    Burial system :