Home » Projets » 2021 YUNLIN OWF

2021 YUNLIN OWF

Provision of personnel and equipment to carry out the post lay burial of infield array cables.

Place: YUNLIN OWF Taiwan
Client : Seaway 7

Product : Powercable
Length (km): 14
Water depth (m) :up to 50 m
Vessel : DP Vessel
Burial system :ROVJET1206 (jetting)
Burial depth (m) : 1.5

Period: July-nov 2021

Other projects

  • 2024 NIGERIA 2

    Separate landing at Qua Lboe. Laying and post-wiring of 22.4 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2023 GHANA

    Separate landing in Accra. Laying and post-wiring of 4.9 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2006 JAKASUSI

    FO cable shore ends / Laying and burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos