2021 HORNSEA 2

Provision of personnel and equipment to carry out the post lay burial of infield array cables.
Place: Hornsea 2 OWF UK waters

Client : Seaway 7
Product : Powercable
Length (km): 366
Water depth (m) : up to 50 m
Vessel : DP Vessel
Burial system : TM05 (trenching)+ROVJET1612 (jetting)
Burial depth (m) : 1.5

Period: May 2021 – May 2022

Other projects

  • 2025 2 AFRICA PEARLS BARHEIN

    Separate landing in Bahrain. Laying and post-wiring 35 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2019 SVERDRUP

    Post lay burial of 199 km of sismic fibre optic cables in Johan Sverdrup field
    Burial system : ROVJET 1206 (jetting)
    Plus d’infos
  • 2015 ILE D’YEU

    Surface laying of 2 sections of power cable YEU3 and YEU4.
    Burial system : N.A.