Home » Projets » 2021 Saint Nazaire OWF

2021 Saint Nazaire OWF

EPCI contract for the Saint-Nazaire OWF Inter-array Cables Procurement, Installation and protection

Place :Saint-Nazaire (France)
Client : Parc Du Banc De Guérande

Length (km): 20
Product : Powercable
Water depth (m) : up to 30 m
Vessel : DPVessel
Burial system : IAC protection using Cast Iron Pipes
Burial depth (m) : N/A

Period: Summer 2021- Autumn 2022

Other projects

  • 2006 THAILAND KHO SAMUI

    Shore ends/Mainland to island/Laying and burial of 115 kV power cable
    Burial system : TJV05 – TJV08 (Jetting)
    Plus d’infos
  • 2004 SIMIAN SAPHIRE

    Provision of nearshore trenching services.
    Burial system : TJV06 (Jetting)
    Plus d’infos
  • 2020 Dunant

    Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos