2021 Saint Nazaire OWF

EPCI contract for the Saint-Nazaire OWF Inter-array Cables Procurement, Installation and protection

Place :Saint-Nazaire (France)
Client : Parc Du Banc De Guérande

Length (km): 20
Product : Powercable
Water depth (m) : up to 30 m
Vessel : DPVessel
Burial system : IAC protection using Cast Iron Pipes
Burial depth (m) : N/A

Period: Summer 2021- Autumn 2022

Other projects

  • 2005 PERENCO Gabon

    Mainland to platforms. Surface lay + J-tube Pull-In
    Burial system : N.A.
    Plus d’infos
  • 2015 ABU ALI

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2013 VISCAS SIR BANYAS

    Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)
    Burial system : TM04 (trencher)
    Plus d’infos