EPCI contract for the Saint-Nazaire OWF Inter-array Cables Procurement, Installation and protection

Place :Saint-Nazaire (France)
Client : Parc Du Banc De Guérande

Length (km): 20
Product : Powercable
Water depth (m) : up to 30 m
Vessel : DPVessel
Burial system : IAC protection using Cast Iron Pipes
Burial depth (m) : N/A

Period: Summer 2021- Autumn 2022