Home » Projets » 2021 Saint Nazaire OWF

2021 Saint Nazaire OWF

EPCI contract for the Saint-Nazaire OWF Inter-array Cables Procurement, Installation and protection

Place :Saint-Nazaire (France)
Client : Parc Du Banc De Guérande

Length (km): 20
Product : Powercable
Water depth (m) : up to 30 m
Vessel : DPVessel
Burial system : IAC protection using Cast Iron Pipes
Burial depth (m) : N/A

Period: Summer 2021- Autumn 2022

Other projects

  • 2025 CSN-1 PANAMA

    Separate landing at Costa del Este. Laying and post-wiring of 11.8 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2022 EQUIANO

    1 x Direct landing at Sesimbra, shell installation and post-burial.
    Burial system :
    Plus d’infos
  • 2017 SAFANIYA 5

    Provision of personnel and equipment to carry out trenching services on five 15 kV submarine power cables.
    Burial system : TM03 (trencher)
    Plus d’infos