2024 NIGERIA 2

Separate landing at Qua Lboe. Laying and post-wiring of 22.4 km of fiber optic cable

Location: Lagos NIGERIA
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 22.4 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm