Home » Projets » 2022 2 AFRICA Spain

2022 2 AFRICA Spain

1 x Direct landing in Barcelona, shell installation and post-burial. Installation of grounding system

Location: Barcelona Spain, Sant Adria de Besos beach
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 650 m
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2.0 m
Product : Fiber Optic Cable
cable type: ø37mm

Other projects

  • 2006 JAKASUSI

    FO cable shore ends / Laying and burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2017 SAFANIYA 5

    Provision of personnel and equipment to carry out trenching services on five 15 kV submarine power cables.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2001 CROSSING TAT 14

    PLIB works on telecom FO cable crossings with RTE / NGC power cables
    Burial system : MED1 (Dredge pump)
    Plus d’infos