Home » Projets » 2022 2 AFRICA Spain

2022 2 AFRICA Spain

1 x Direct landing in Barcelona, shell installation and post-burial. Installation of grounding system

Location: Barcelona Spain, Sant Adria de Besos beach
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 650 m
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2.0 m
Product : Fiber Optic Cable
cable type: ø37mm

Other projects

  • 1999 ELGIN FRANKLIN

    Platform to platform / Composite power and communication cable + 1 composite power / communication cable + 1 umbilical.
    Burial system : CASTOR 2 (Trencher)
    Plus d’infos
  • 2000 PEC / LEVEL 3/ FLUTE

    PLIB works on telecom fibre optic cable crossings.
    Burial system : MED 1: Dredge pump / jetting tool
    Plus d’infos
  • 2010 MANIFA

    Provison of technical and engineering services / Cable laying and trenching services.
    Burial system : TM04 (Trencher)
    Plus d’infos