2008 DELMA
Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.
Location : Delma Island (UAE)
Client : NEXANS Norway
Length (km): 85
Water depth (m) : 35
Vessel : Barge
Burial system : TM04 (Trencher)
Burial depth (m) : 1
Product : Power Cable
Weight (kg/m) : 55
Diameter : 194 mm
Download the project sheet