Home » Projets » 2022 2/AFRICA GENES

2022 2/AFRICA GENES

2 x Direct landings in Genoa. Installation of shells and post-sinking. Installation of grounding system

Location: Genes ITALY
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 2 x 700 m
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2.0 m
Product : Fiber Optic Cable
cable type: ø44mm

Other projects

  • 2022 HORNSEA 2

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos
  • 2008 PERENCO – CAMEROON

    Barge operating for pipe laying
    Burial system : N.A.
    Plus d’infos
  • 2018 IFA 2000 CABLES REPAIR

    Repair of 2 power cables being part of the IFA 2000 link on the beach at Sangatte.
    Burial system : ROVJET 605 (jetting) + Massflow
    Plus d’infos