2022 2/AFRICA GENES

2 x Direct landings in Genoa. Installation of shells and post-sinking. Installation of grounding system

Location: Genes ITALY
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 2 x 700 m
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2.0 m
Product : Fiber Optic Cable
cable type: ø44mm

Other projects

  • 2025 MARJAN GOSP 4

    Supply of personnel and trenching services for two separate 230 kV composite submarine cable burial services on the Marjan field as part of the Marjan Oil-Gas Separation Plant No. 4 (MRJN GOSP 4) development project.
    Burial system :
    Plus d’infos
  • 2002 FLAG SOUTH PLIB

    PLIB works on telecommunication fibre optic cable.
    Burial system : MED1 (Dredge pump)
    Plus d’infos
  • 2000 PEC / LEVEL 3/ FLUTE

    PLIB works on telecom fibre optic cable crossings.
    Burial system : MED 1: Dredge pump / jetting tool
    Plus d’infos