Separate landing in Luanda. Laying and post-wiring of 7.2 km of fiber-optic cable

Location: Luanda Angola
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 8.8 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2017 SAFANIYA 5

    Provision of personnel and equipment to carry out trenching services on five 15 kV submarine power cables.
    Burial system : TM03 (trencher)