Home » Projets » 2023 ANGOLA

2023 ANGOLA

Separate landing in Luanda. Laying and post-wiring of 7.2 km of fiber-optic cable

Location: Luanda Angola
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 8.8 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 1998 VNF SUD FRANCE

    Along river – canal / Dual fibre optic cable.
    Burial system : EBJ 02 (jetting)
    Plus d’infos
  • 2001 I 2 I / Shore end MADRAS

    Cable lay and burial – 8 km CHENNAI shore end.
    Burial system : TJV05 + TJV04 (Jetting) + ESV07 (Plough)
    Plus d’infos
  • 2024 HAI LONG

    Post Lay Burial of EXP
    Burial system :
    Plus d’infos