Home » Projets » 2023 ANGOLA

2023 ANGOLA

Separate landing in Luanda. Laying and post-wiring of 7.2 km of fiber-optic cable

Location: Luanda Angola
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 8.8 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2015 QUIBERON BELLE ISLE 4

    Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
    Burial system : N.A.
    Plus d’infos
  • 2008 TAURT FIELD DEVELOPMENT

    Post trenching of subsea umbilical / PLIB
    Burial system : ROVJET401 (Jetting)
    Plus d’infos
  • 2010 HONOTUA

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : Dredge pump (with divers)
    Plus d’infos