Home » Projets » 2025 2 AFRICA PEARLS BARHEIN

2025 2 AFRICA PEARLS BARHEIN

Separate landing in Bahrain. Laying and post-wiring 35 km of fiber optic cable

Location: Manama, Bahrain
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 35 km
Water depth (m) :
Vessel: BARGE DP
Trenching system: TO MOBILE
Trenching depth (m): 2m
Product: Fiber optic cable
cable type: ø37mm

Other projects

  • 2023 GHANA

    Separate landing in Accra. Laying and post-wiring of 4.9 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2009 IMEWE/MENA/TEN/EIG

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : TO Mobile
    Plus d’infos
  • 2011 WALNEY 2

    Post Lay Inspection and Burial of 51 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos