Home » Projets » 2022 MAPUTO

2022 MAPUTO

Separate landing in Maputo. Laying and post-wiring of 42 km of fiber-optic cable

Location: Maputo – Mozambique
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 42 km
Water depth (m) :
Vessel: BARGE DP
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2019 SAFANIYA 6

    Provision of personnel and equipment to carry out the trenching of 11 submarine cables, umbilicals and flexibles on Safaniya 6 field.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2022 GRACE HOPPER

    Separate landing in a directional borehole. Simultaneous installation and beaming with mechanical trencher
    Burial system :
    Plus d’infos
  • 2025 PEARLS CABLE STORAGE

    Storage of fiber optic cable and repeaters in Bahrain
    Burial system :
    Plus d’infos