Home » Projets » 2024 HAI LONG

2024 HAI LONG

Post Lay Burial of EXP

Location: Taiwan
Customer: SEAWAY 7

Length (km): 113 km
Water depth (m) :
Vessel: Boka Tiamat
Beaching system: ROVJET 1217 B
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø

Other projects

  • 2000 Dumpton Gap – Level 3

    Remedial work : Lay and simultaneous burial of fibre optic cable.
    Burial system : ESV11 (Plough)
    Plus d’infos
  • 2011 WACS

    FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS
    Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
    Plus d’infos
  • 2023 YUNLIN

    Assistance to laying
    Burial system :
    Plus d’infos