Home » Projets » 2024 HAI LONG

2024 HAI LONG

Post Lay Burial of EXP

Location: Taiwan
Customer: SEAWAY 7

Length (km): 113 km
Water depth (m) :
Vessel: Boka Tiamat
Beaching system: ROVJET 1217 B
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø

Other projects

  • 2014 BUTENDIEK

    Provision of personnel and equipment to carry out the post burial of 86 infield power cables.
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2018 IFA 2000 CABLES REPAIR

    Repair of 2 power cables being part of the IFA 2000 link on the beach at Sangatte.
    Burial system : ROVJET 605 (jetting) + Massflow
    Plus d’infos
  • 2014 GÉOCEAN BÉNIN

    Laying of 14km of power cable between mainland and a platform. Burial in shallow water from 8m to the beach.
    Burial system : EBJ (jetting)
    Plus d’infos