Home » Projets » 2024 HAI LONG

2024 HAI LONG

Post Lay Burial of EXP

Location: Taiwan
Customer: SEAWAY 7

Length (km): 113 km
Water depth (m) :
Vessel: Boka Tiamat
Beaching system: ROVJET 1217 B
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø

Other projects

  • 1998 BELIZE

    Main land to island / 34.5 kV power extension.
    Burial system : TJV04 (Jetting)
    Plus d’infos
  • 2014 GÉOCEAN BÉNIN

    Laying of 14km of power cable between mainland and a platform. Burial in shallow water from 8m to the beach.
    Burial system : EBJ (jetting)
    Plus d’infos
  • 2007 PICOT / GONDWANA

    FO cable shore ends – Post lay burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos