Home » Projets » 2024 HAI LONG

2024 HAI LONG

Post Lay Burial of EXP

Location: Taiwan
Customer: SEAWAY 7

Length (km): 113 km
Water depth (m) :
Vessel: Boka Tiamat
Beaching system: ROVJET 1217 B
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø

Other projects

  • 2024 ZHONG NENG

    Assistance to laying
    Burial system :
    Plus d’infos
  • 2001 ULYSSE

    Recover of existing cable (5 km), simultaneous lay and burial work (ESV12), PLIB work of joints (MED 1 and diver pump).
    Burial system : MED1 (Dredge pump) – ESV12 (Plough)
    Plus d’infos
  • 2023 GABON

    Separate landing in Libreville. Laying and post-wiring of 16.9 km of fiber optic cable
    Burial system :
    Plus d’infos