Home » Projets » 2024 ZHONG NENG

2024 ZHONG NENG

Assistance to laying

Location: Taiwan
Customer: SEAWAY 7

Length (km): n/A
Water depth (m) :
Vessel: Seaway Phoenix
Beaching system: RN/A
Beaching depth (m): N/A
Product : Power cable
cable type: ø

Other projects

  • 2023 MUANDA

    Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2015 SEA LION Rostock

    1 shore end in Germany + Laying and burial of the same cable offshore in Denmark, in low water depths.
    Burial system : ROVJET404 + EBJ (jetting)
    Plus d’infos
  • 2004 SIMIAN SAPHIRE

    Provision of nearshore trenching services.
    Burial system : TJV06 (Jetting)
    Plus d’infos