Home » Projets » 2024 ZHONG NENG

2024 ZHONG NENG

Assistance to laying

Location: Taiwan
Customer: SEAWAY 7

Length (km): n/A
Water depth (m) :
Vessel: Seaway Phoenix
Beaching system: RN/A
Beaching depth (m): N/A
Product : Power cable
cable type: ø

Other projects

  • 2022 EQUIANO

    1 x Direct landing at Sesimbra, shell installation and post-burial.
    Burial system :
    Plus d’infos
  • 2023 HKZ Project

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos
  • 2015 FITZROY Port Hedland

    2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.
    Burial system : TM04 (trenching) + EBJ (jetting)
    Plus d’infos