2023 CONGO

Separate landing at Pointe Noire. Laying and post-wiring of 8.8 km of fiber optic cable

Location: Pointe Noire – CONGO
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 8.8 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2014 GÉOCEAN BÉNIN

    Laying of 14km of power cable between mainland and a platform. Burial in shallow water from 8m to the beach.
    Burial system : EBJ (jetting)
    Plus d’infos
  • 2022 GRACE HOPPER

    Separate landing in a directional borehole. Simultaneous installation and beaming with mechanical trencher
    Burial system :
    Plus d’infos
  • 2009 KASHAGAN

    Provison of burial services for 1 power cable and 2 umbilicals.
    Burial system : TM03 (Trencher)
    Plus d’infos