2023 BLUE PALERMO

1 x Direct landing in Palermo, shell installation, post-burial. Installing the grounding system

Location: Palermo, Italy, Isola del Femmine Beach
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 750 m
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm