2023 BLUE PALERMO

1 x Direct landing in Palermo, shell installation, post-burial. Installing the grounding system

Location: Palermo, Italy, Isola del Femmine Beach
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 750 m
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2005 ORASCOM MED CABLE

    MED CABLE direct shore ends (FO)
    Burial system : TJV07 (Jetting)
    Plus d’infos
  • 2020 Dunant

    Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2024 HAI LONG

    Post Lay Burial of EXP
    Burial system :