2009 KASHAGAN

Provison of burial services for 1 power cable and 2 umbilicals.

Location : Kashagan oil field – Kazakhstan
Client : SONSUB (for SAIPEM)

Length (km): 18
Water depth (m) : 6
Vessel : Barge
Burial system : TM03 (Trencher)
Burial depth (m) : 2
Product : Flowline / Power cable
Weight (kg/m) : 1,4 
Diameter : 23 mm