Home » Projets » 2009 KASHAGAN

2009 KASHAGAN

Provison of burial services for 1 power cable and 2 umbilicals.

Location : Kashagan oil field – Kazakhstan
Client : SONSUB (for SAIPEM)

Length (km): 18
Water depth (m) : 6
Vessel : Barge
Burial system : TM03 (Trencher)
Burial depth (m) : 2
Product : Flowline / Power cable
Weight (kg/m) : 1,4 
Diameter : 23 mm

Other projects

  • 1998-1999 VNF PARIS

    Along river / Laying and burial of 3 multiple FO cables laid in one go
    Burial system : ESV 07 / ESV11 (Plough)
    Plus d’infos
  • 2023 GHANA 2

    Recovery and replacement of damaged Ace cable in Accra. Laying and post-wiring of 5 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2025 2 AFRICA PEARLS BARHEIN

    Separate landing in Bahrain. Laying and post-wiring 35 km of fiber optic cable
    Burial system :
    Plus d’infos