Home » Projets » 2023 BLUE PALERMO

2023 BLUE PALERMO

1 x Direct landing in Palermo, shell installation, post-burial. Installing the grounding system

Location: Palermo, Italy, Isola del Femmine Beach
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 750 m
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2015 ILE D’YEU

    Surface laying of 2 sections of power cable YEU3 and YEU4.
    Burial system : N.A.
    Plus d’infos
  • 2015 MANIFA

    Provision of personnel and equipment to carry out the trenching of 3 power cables and 2 fiber optic cables.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2024 2 AFRICA

    PLIB in various West African countries
    Burial system :
    Plus d’infos