1 x Direct landing in Palermo, shell installation, post-burial. Installing the grounding system

Location: Palermo, Italy, Isola del Femmine Beach
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 750 m
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2015 AMRUMBANK

    Provision of personnel and equipment to carry out the post burial of 86 infield power cables.
    Burial system : ROVJET810 (jetting)