Home » Projets » 2022 EQUIANO

2022 EQUIANO

1 x Direct landing at Sesimbra, shell installation and post-burial.

Location: Sessimbra Portugal
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 1 km
Water depth (m) :
Vessel: N/A
Beam system: N/A
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2015 FITZROY Port Hedland

    2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.
    Burial system : TM04 (trenching) + EBJ (jetting)
    Plus d’infos
  • 2025 CSN-1 PANAMA

    Separate landing at Costa del Este. Laying and post-wiring of 11.8 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2023 GHANA

    Separate landing in Accra. Laying and post-wiring of 4.9 km of fiber optic cable
    Burial system :
    Plus d’infos