Home » Projets » 2024 MORAY WEST

2024 MORAY WEST

Assistance to laying

Location: Taiwan
Customer: SEAWAY 7

Length (km): n/A
Water depth (m) :
Vessel: Seaway Phoenix
Beaching system: RN/A
Beaching depth (m): N/A
Product : Power cable
cable type: ø

Other projects

  • 2025 MARJAN GOSP 4

    Supply of personnel and trenching services for two separate 230 kV composite submarine cable burial services on the Marjan field as part of the Marjan Oil-Gas Separation Plant No. 4 (MRJN GOSP 4) development project.
    Burial system :
    Plus d’infos
  • 2017 SAFANIYA 5

    Provision of personnel and equipment to carry out trenching services on five 15 kV submarine power cables.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2015 ILE D’YEU

    Surface laying of 2 sections of power cable YEU3 and YEU4.
    Burial system : N.A.
    Plus d’infos