Home » Projets » 2022 EQUIANO

2022 EQUIANO

1 x Direct landing at Sesimbra, shell installation and post-burial.

Location: Sessimbra Portugal
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 1 km
Water depth (m) :
Vessel: N/A
Beam system: N/A
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2023 ANGOLA

    Separate landing in Luanda. Laying and post-wiring of 7.2 km of fiber-optic cable
    Burial system :
    Plus d’infos
  • 2026 Lumalink

    Mobilization of the DP barge in Panama, followed by towed transit to Cayenne (French Guiana). Separate shore-end landing, simultaneous laying and burial of 15 km of fiber optic cable.
    Burial system :
    Plus d’infos
  • 2001 I 2 I / Shore end MADRAS

    Cable lay and burial – 8 km CHENNAI shore end.
    Burial system : TJV05 + TJV04 (Jetting) + ESV07 (Plough)
    Plus d’infos