Home » Projets » 2025 CSN-1 COLOMBIA

2025 CSN-1 COLOMBIA

Separate landing in Barranquilla. Laying and post-wiring of 8.5 km of fiber optic cable, Installation of grounding system

Location: Barranquilla, Colombia
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 8.5 km
Water depth (m) :
Vessel: BMV GRATUS
Beam system: TO MOBILE
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2015 ILE D’YEU

    Surface laying of 2 sections of power cable YEU3 and YEU4.
    Burial system : N.A.
    Plus d’infos
  • 2023 2 AFRICA MOZAMBIQUE

    1 x Direct landing at Nacala, shell installation, post-burial. Installing the grounding system
    Burial system :
    Plus d’infos
  • 2023 MARTINIQUE

    Installation of 2 new electrical links in the bay of Fort de France
    Burial system :
    Plus d’infos