Home » Projets » 2025 CSN-1 COLOMBIA

2025 CSN-1 COLOMBIA

Separate landing in Barranquilla. Laying and post-wiring of 8.5 km of fiber optic cable, Installation of grounding system

Location: Barranquilla, Colombia
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 8.5 km
Water depth (m) :
Vessel: BMV GRATUS
Beam system: TO MOBILE
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2009 IMEWE/MENA/TEN/EIG

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : TO Mobile
    Plus d’infos
  • 2007 ATLAS OFFSHORE

    FO cable shore ends – Post lay burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2010 MANIFA

    Provison of technical and engineering services / Cable laying and trenching services.
    Burial system : TM04 (Trencher)
    Plus d’infos