Home » Projets » 2025 CSN-1 COLOMBIA

2025 CSN-1 COLOMBIA

Separate landing in Barranquilla. Laying and post-wiring of 8.5 km of fiber optic cable, Installation of grounding system

Location: Barranquilla, Colombia
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 8.5 km
Water depth (m) :
Vessel: BMV GRATUS
Beam system: TO MOBILE
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2013 VISCAS SIR BANYAS

    Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)
    Burial system : TM04 (trencher)
    Plus d’infos
  • 2019 SAFANIYA 6

    Provision of personnel and equipment to carry out the trenching of 11 submarine cables, umbilicals and flexibles on Safaniya 6 field.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2011 WALNEY 2

    Post Lay Inspection and Burial of 51 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos