Home » Projets » 2024 2 AFRICA PEARLS

2024 2 AFRICA PEARLS

1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system

Location: Salalah Oman
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 2.6 km
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2024 MARSEILLE

    1 x Direct landing in Marseille, installation of shells, post-sinking, installation of posidonia anchors. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2005 PERENCO Gabon

    Mainland to platforms. Surface lay + J-tube Pull-In
    Burial system : N.A.
    Plus d’infos
  • 2015 WASIT

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM04 (trenching)
    Plus d’infos