1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system

Location: Salalah Oman
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 2.6 km
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2003 AL KHAFJI

    Laying and burial of 40 km of power cable in Saudi Arabia.
    Burial system : TM02 (Trencher)
    Plus d’infos
  • 2014 WINTERSHALL

    Provision of personnel and equipment to carry out the post burial of 1 umbilical between 2 offshore platforms.
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2025 NOY YEU NOIRMOUTIER WINDFARM

    EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.
    Burial system :